PROJECT:

The caretakers and authorities at Methodist Church were planning some alterations to be made to the building and surrounding, & hence required a Measured Building Survey.

  • The survey requirements were to map & provide:
  • Floor plans of the Ground floor
  • Floor Plans for the First floor/Mezzanine
  • 3 Elevations and
  • A section of the Building

METHODOLOGY:

  • The Internal Measured Survey has carried out a handheld laser measuring device that connects to a PDA via Bluetooth and a tape
  • Building Elevations ranged from a basic outline to highly detailed surveys showing cornices and brickwork patterns.
Measured 3